MARINA run progress

With the initial telemetry analysis and checkout phase done, GRIFEX operations has shifted primarily to data generation and mass downlink. GRIFEX’s performance on-orbit has thus far been mostly nominal, allowing us to complete 11 runs of the MARINA payload and

GRIFEX alive and well!

We are excited to report that GRIFEX is doing well on orbit! Initial telemetry looks great. We are power positive. Temperatures are in good, safe ranges. GRIFEX has also responded well to commands. We are in the process of checking